Project description

The ABB-BG factory in Sevlievo is subject to a major re-construction and design overhaul. Production processes are updated and streamlined. The indoor space-planning is adapted to the new requirements for production and logistics. The shell of the factory is being improved to fulfill current building and environmental codes. We were engaged to manage the process and filter it through our past experience while designing other buildings for ABB.

While assessing the redevelopment cost for the entire project, which consists of a production facility, several auxiliary buildings, power-stations and an office building a SWOT analysis shows that the cost of rehabilitation of the office building exceeds such cost for a new building of the same size.
Construction cost for a new building are agreeable but further aspects like:
- Operational/ Brand and Esteem value
- Efficiency and performance
- Function are factored into the decision.

project name
ABB Sevlievo 1
time
2013-2015
type
Rehabilitation of existing production facility from the 60’s
client
ABB Bulgaria
size
15.000m2
location
Sevlievo Bulgaria
investment
EUR 15 mio
status:
Completed 2015
performance
LP 6 preparation tendering
LP 7 tendering administration
LP 8 – Project Administration
LP 9 Project Management
references